By RFID MFG Editorial Team · Updated August 12, 2026 · 3 min read
How MOQ works here
MOQ is set per production run, not per year — it reflects the point where setup, tooling and material changeover stop dominating the unit cost. Different constructions have different economics, which is why a PVC card and a reel-converted inlay have very different minimums. The table below is the same data our quotes are built from.
Why labels and inlays have higher MOQs
Labels and inlays are converted reel-to-reel: antenna bonding, adhesive lamination and die-cutting run as a continuous process, and starting the line for a short run wastes most of a reel. That is why label MOQs are counted in thousands while cards and tags start in the hundreds.
The free sample policy
Pre-production samples are free and arrive in 3–7 days. They exist so you can verify the chip on your own readers, check print and material in hand, and catch spec problems while they are still free to fix. An artwork proof accompanies the samples; bulk production starts only after you approve both.
Below-MOQ trial runs
Smaller trial batches are sometimes possible on standard specs — existing constructions without custom tooling. If you are piloting a system before a larger rollout, say so in the inquiry: we would rather support a serious pilot than lose the rollout.
MOQ, sample and bulk lead time by product
| Product | MOQ | Sample lead | Bulk lead |
|---|---|---|---|
| Contact IC Chip Card | 500 pcs | 3–5 days | 7–15 days |
| Hotel Keycard | 500 pcs | 3–5 days | 7–15 days |
| PVC Cards | 500 pcs | 3–5 days | 7–15 days |
| RFID / NFC Card | 500 pcs | 3–5 days | 7–15 days |
| RFID Epoxy Card | 500 pcs | 3–5 days | 7–15 days |
| Custom Card Program | 500 pcs | 3–5 days | 7–15 days |
| Wooden RFID Card | 500 pcs | 3–5 days | 7–15 days |
| Metal Card | 500 pcs | 3–5 days | 7–15 days |
| Eco-Friendly Card | 500 pcs | 3–5 days | 7–15 days |
| NFC Business Card | 500 pcs | 3–5 days | 7–15 days |
| Dual-Frequency RFID Card | 500 pcs | 3–5 days | 7–15 days |
| Magnetic Stripe Card | 500 pcs | 3–5 days | 7–15 days |
| PVC Scratch Card | 500 pcs | 3–5 days | 7–15 days |
| NFC Printed Label / Sticker | 1,000 pcs | 3–5 days | 7–12 days |
| RFID Dry Inlay | 2,000 pcs | 3–5 days | 7–12 days |
| RFID Wet Inlay / Sticker | 2,000 pcs | 3–5 days | 7–12 days |
| RFID White Label / Sticker | 1,000 pcs | 3–5 days | 7–12 days |
| UHF RFID Label | 1,000 pcs | 3–5 days | 7–12 days |
| RFID Animal Tag | 500 pcs | 3–7 days | 10–18 days |
| RFID Anti-Metal Tag | 500 pcs | 3–7 days | 10–18 days |
| RFID Keyfob | 500 pcs | 3–7 days | 10–18 days |
| RFID Wristband | 500 pcs | 3–7 days | 10–18 days |
| Specialty RFID Tags | 500 pcs | 3–7 days | 10–18 days |
| RFID Laundry Tag | 500 pcs | 3–7 days | 10–18 days |
| NFC Pet ID / Dog Tag | 500 pcs | 3–7 days | 10–18 days |
| RFID Jewelry Tag | 500 pcs | 3–7 days | 10–18 days |
| RFID Library Tag & Label | 500 pcs | 3–7 days | 10–18 days |
| UHF Windshield Tag | 500 pcs | 3–7 days | 10–18 days |
| High-Temperature RFID Tag | 500 pcs | 3–7 days | 10–18 days |
| RFID Seal / Cable-Tie Tag | 500 pcs | 3–7 days | 10–18 days |
| RFID Silicone Wristband | 500 pcs | 3–7 days | 10–18 days |
| Disposable Paper Wristband | 1,000 pcs | 3–7 days | 10–18 days |
| RFID Blocking Card | 500 pcs | 3–5 days | 7–15 days |
| RFID Blocking Sleeves | 500 pcs | 3–5 days | 7–15 days |
| RFID Blocking Wallet | 500 pcs | 3–5 days | 7–15 days |
| Barcode Scan Module / Engine | 10 units | 5–7 days | 10–20 days |
| Industrial IoT DTU / RTU | 10 units | 5–7 days | 10–20 days |
| RFID LF/HF/UHF Reader / Writer | 10 units | 5–7 days | 10–20 days |
| RFID Smart Cabinet / Terminal | 10 units | 5–7 days | 10–20 days |
Related reading
Frequently asked questions
What is the minimum order for custom RFID cards?
Card MOQs start at 10 pieces per run for standard constructions. Specialty builds (metal, dual-interface) can differ — the table on this page shows the real minimum for each product.
Are samples really free?
Yes. Pre-production samples are free, ship in 3–7 days, and carry no obligation — bulk production only starts after you approve them.
Can I order less than the MOQ?
Sometimes, on standard specs without custom tooling. Share your use case and target quantity — pilot runs ahead of a larger rollout are usually workable.
Do sample chips match production chips?
Yes — samples are built with the same chip and construction quoted for production, so what you validate is what you receive in bulk.